The former is characterized by the ability to know requirements with surety in advance, thereby making deterministic scheduling possible. 前者的特征是确保具有提前了解需求的能力,因而可以制订确定性计划。
To schedule deterministic pauses for GC, Metronome uses two different threads to achieve both consistent scheduling and short, uninterrupted pause times 为了给GC调度确定性暂停,Metronome使用了以下两个不同的线程来完成一致性调度和短暂连续的暂停时间
Research and Implementation of MDSF-A Deterministic Scheduling Framework of Multithreading Replication System 多线程复制系统的确定性调度框架MDSF的研究与实现
In this paper, the deterministic model of cascaded hydropower station optimal scheduling is compared with the stochastic model, and the deterministic model is mainly researched. 文中比较了梯级水电优化调度的确定性模型和随机模型,并着重探讨了确定性模型。
Since the fact that the reservoir inflow is known in term of scheduling, the problem need directly and distinctly be replied. The model is the deterministic optimize scheduling model of single reservoir. 由于实时洪水调度所具有的特点,调度期内的入库洪水为已知,在实时调度中回答问题必须直接、清晰,因此调度太原理工大学硕士研究生学位论文模型属于确定性单库优化调度。
The deterministic problem of minimizing total weighted deviations of job completion times from a common due date on a single machine ( abbreviated to TWD problem) is a typical scheduling model in Just-In-Time production environment. The general TWD problem is NP-hard. 完工时间与交货期偏差加权和最小化单机调度(简记TWD)问题是Just-In-Time生产环境下典型的调度模型,是NP-hard问题。
According to whether the job's processing time, released time and the surroundings of the processors are deterministic or stochastic, scheduling problem can be grouped as deterministic scheduling problem and stochastic scheduling problem. 根据任务加工时间和到达时间以及处理机的工作环境等数据是确定的或服从某种随机分布可分为:确定性排序问题和随机排序问题;
Several input-queued scheduling algorithms are surveyed in this paper. The scheduling algorithms are classified into four classes: maximum size matching, maximum weight matching, stable marriage matching, and deterministic scheduling algorithm. 主要讨论输入排队调度算法,将现有的调度算法分为4类:最大(无权重)匹配、最大权重匹配、稳定婚姻匹配和确定型调度。
The deterministic scheduling algorithm's implementation is simple, but tasks must execute according to given order; 其中确定模式的调度算法实现比较简单,但在任务的执行有严格的次序;
Two-stage procedure for deterministic single-machine scheduling problem 确定性单机调度问题的一种两阶段方法
Also, the deterministic counterpart of this single machine scheduling problem is a special case of fuzzy version. 指出确定性环境下的最小化误工任务数单机调度问题是模糊情况的特例。
The traditional deterministic vehicle scheduling problem ( VSP) was expanded into a VSP with fuzzy features. The cost coefficients of the VSP with the features were treated as fuzzy numbers. 将传统的确定性车辆调度问题扩展为具有模糊特征的模糊车辆调度问题。
Secondly, as for the job shop scheduling problem with deterministic time intervals, a new suitable model is built on base of classic job shop scheduling problem. 其次,针对确定型时间间隔的作业车间调度问题,本文在经典作业车间调度问题的模型基础上,构建了符合此问题的新的调度模型。
After analytically modeling the dynamic voltage scaling system, we present a control theoretic design and analysis method for feedback scheduler. In this way, deterministic performance of feedback scheduling is achieved and closed-loop energy management is realized. 在建立了动态电压调节系统的解析数学模型之后,给出了一种基于控制理论的反馈调度器设计、分析方法,从而获得了具有确定性的反馈调度性能,提供了一种有效的闭环能量管理机制。
Deeply studied the EPA communication mechanism, include EPA communication model, data link layer model, principle and realization of the deterministic scheduling. 对EPA通信机制进行了深入研究,包括:EPA通信模型、数据链路层模型、确定性调度原理与实现。
Previous work mostly focused on deterministic scheduling problems with an assumption that the manufacturing environment is ideal, thus there is a large gap between theory and practice of production scheduling. 以往的关于调度的研究主要集中在理想的调度环境,一般都是以确定性的数学模型为基础,与实际的车间调度环境存在很大差别。